The aim of the project

 

It aims to combat the problems of poverty and unemployment and work to stabilize the population in this region and improve their living conditions.

 

Components of the project

 

- 27 agricultural units, with an area of 20 acres, per unit.
- 2 groundwater wells with a production capacity of 80 m3 / hour.
- Irrigation network of polyethylene, iron and ductile pipes.
- A concrete tank with a capacity of 2000 m3
- Pumps and control room for the project

 

Duration of the project

 

  • 365 calendar days.